• Sourcing Solutions
  • Services & Membership
  • Help & Community

Quick Details

  • Place of Origin: Shandong, China (Mainland)
  • Brand Name: hsdmcl
  • Model Number: china frame home
  • Material: Steel
  • Use: Hotel, House, Kiosk,Booth, Office, Sentry Box,Guard House, Shop, Toilet, Villa
  • Certificate: ISO9001:2000
  • Name: prefabricated steel frame modular flat pack china frame home
  • Door: anti-theft door or sandwich panel door
  • Window: aluminium alloy window
  • Floor: PVC floor
  • Earthquake proofing: grade 7
  • Wall system: EPS sandwich panel, insulation, fire
  • Electricity: custom made
  • Foundation: steel foundation
  • Key words: china frame home

Packaging & Delivery

Packaging Details china frame home in bulk as export standard package
Delivery Time Shipped in 25 days after payment

prefabricated steel frame modular flat pack china frame home

 

Product Description

 

House Appearance

Your cheap mini mobile homes would look like follow picture

 















Material Information:

  

Your house would be built with follow materials. It is anti-rust, anti-corrosion, winds resistance, seismic, heat insulation, sound insulation and fireproof.

 

Frame

Painted light steel frame

Roof

sandwich panels, EPS, PU or XPS material

Wall

sandwich panels, EPS, Rockwool, PU, MGO or XPS material

Door

insulation sandwich panel door, EPS, Rockwool, PU, MGO or XPS material

Window

Aluminum / PVC silding window with single glass

 

 

 

Packaging & Shipping

 

Your house would be knock down to ship.

 

Bulk-packed for steel structure, wall and roof, wooden carton for hardware, bubble wrap for door and windows. 

 

 Ready to shipping:

Container Loading:

 

Our Services

 

Quality Control:

Your orders would be supervise by our professional QC team, from material purchase, production, package and container loading. The result would show to you in the Certificate of Conformance.

 

Installation 

 

After order, you would get a installation drawing and there is a label on each component. So you would know the useful for each material and where should it be built in. You could assembly your house easily and fast.

 

If necessery, you could send your staff to our company to training. Or we could send supervior to your site, also.

 

 

 

Company Information

 

laizhou hongshengda machinery  Co. Ltd. is a steel structure manufacturer in China. For over 10 years we have been fabricating and erecting high quality warehouses, workshops, sheds, industrial buildings,

container house and prefabricated houses. 

We possess many advanced production line and machines.


* Light/heavy H steel production line 
* BOX production line 
* C/Z purlin production line 
* Various types of profiling steel sheet machines 
* Laser cutting machine 
* CNC machine
* Punching machine
* Sheet-metal shears
* Bending machine 
* Polishing machine

 

Market and Application:
1.North America, South America, Eastern Europe, Southeast Asia, Africa

2.Apply for light steel structure,warehouse,workshop,heavy steel structure,exhibition
hall,villa,prefabricated house ect.

FAQ

 

Reply: Portal frame is the usual type in the industrial workshop and warehouse shed. Other types also could be designed and manufacturer as per clients’ request.

2. What’s the quality grade of the steel structure components?

Reply: Q345 is used for main steel structure, Q235 is used for secondary steel structure. 
3. How about the delivery time?
Reply: Usually,within 45-60 days after the order confirmed, also depends on the fabrication quantity.
4. How about the derust grade?
Reply: Ball blasting Sa2.5 on main steel structure; 
manual derust St2.0 on secondary steel structure.
5. What kind panel used for the roof and wall?
Reply: Color corrugated steel sheet and sandwich panel could be used. Sandwich panel performs well on the heat insulation,sound insulation.Common sandwich materials are EPS, glass wool and PU.
6. How to install it?

Reply: We will furnish you the detailed construction drawing and the construction manual which could help you to erect and install the building step by step. We also could send the engineer to your local to help you if needed.

7. Maintenance:
Reply: Finish paint need be done after the frame installed, and do it again after 6-8 months. So the surface will stay more time.

 

 

Transaction History of the Supplier

Below is the information about the supplier's transactions conducted via Alibaba.com. If you require further details regarding the transaction data, please contact the supplier directly.

Transaction Overview

Transactions

Transaction Details

This supplier has completedtransactions with buyers from .

Shipping Destination
Transaction Value
Transaction Date
Email to this supplier
China (Mainland) | Manufacturer, Trading Company
Transaction Level:
Supplier Assessments:
The supplier supports Trade Assurance – A free service that protects your orders from payment to delivery.
Supplier's Trade Assurance Limit: US $37,000
Learn More